"Privica couldn't have been more helpful through the design phase for the Dispersal Area and Hangar floor at RAF Leconfield. As a non-standard design solution to both areas, they liaised fully with the Defence Estates engineers to derive solutions that accommodated all of the relevant loading criteria whilst offering improved performance and maintenance characteristics.

When it came to the installation phase of the grouted macadam they were able to meet all of their programmed installation rates and were flexible enough to be able to reschedule works to maintain their target dates if the sequence had to be changed to accommodate events beyond their control. At all times it was obvious that they were offering a service as much as a standard subcontract package, with the intent to make their works as painless as possible for the Clugston site management team. The end product looked excellent and was defect free at the end of the maintenance period. If I was looking for a grouted macadam solution in the future, I would have no hesitation in calling on Privica".

Cliff Scott
PROJECT DESIGN MANAGER
CLUGSTON CONSTRUCTION




 

Location: Home > Pavements > Testimonials

Testimonials

RAF Leconfield

"Privica couldn't have been more helpful through the design phase for the Dispersal Area and Hangar floor at RAF Leconfield...... full text click here

Allied Glass

‘Privica were commissioned to lay a 60mm Confalt reinforced grouted macadam overlay to an existing ground bearing floor slab in a 320,000sq ft former foundry building...... full text click here

Allied Glass

"I can confirm that the works were carried out at Allied Glass on budget......full text click here